Stewart Hill Park Phase II

We are preparing to start construction on Phase Two of the new park located between 800 and 900 East just North of the cemetery.  Head up there, take a look and walk the 10-foot-wide sidewalk that winds along the brow of the hill with a beautiful view out over the valley. There are two parking lots with lights and stormwater retention basins. Water, sewer and electrical utilities are stubbed in.

Depending on construction cost and budget, we hope to achieve most of the following this Summer and Fall during Phase Two: South sidewalk, finish east fence, restroom, pavilion and sprinkler system.

We are extremely grateful for the RAPZ Grants totaling $265,000 awarded to River Heights City for this park.

Stewart Hill Park